Vienna Central Station
In February 2017, Swiss architectural practice Theo Hotz Partner Architekten unveiled their new platform covers for Vienna’s Central Station. The undulating steel canopies won an Architizer A+ Award in the Bus and Train Stations category in 2016.
The new sculptural roofs are part of a major overhaul of the station, which is a pivotal hub for the city’s transport network.
The designers envisaged a public transportation hub with a sculptural roof that would function both as a flagship urban project and a landmark for a district in the process of change, with the station also providing the impetus for the further development and the creation of a new municipal park.
Providing a clear iconic identity for the station, the roof comprises a folded plate structure that undulates rhythmically above the five platforms, defining striking interior and exterior spaces.
The juxtaposition between the rise and fall in one direction and the compression and expansion in the other transforms a simple platform canopy into a spectacular roof exuding a strong sense of movement.
Comprising fourteen diamond-shaped segments and five single canopies, the roof extends in an alternating wave pattern over the platforms. Each diamond roof segment consists of a space frame punctured in the centre by a rhombus-shaped skylight.
The staggered arrangement of these linked segments in turn creates diamond-shaped openings on the sides, which are enclosed by a façade of scale-like triangular glass panels to provide protection against the elements.
The angled lines of the soffits reflect those of the folded plate structure above and their triangular surfaces create a striking crystalline form that produces stunning light effects.
Images and content courtesy of Theo Hotz Partner.
Photographs © Roman Bönsch.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.